Drivers in and around Waverley will have three National Highways road closures to watch out for this week.
And one of them is expected to cause delays of between 10 and 30 minutes.
The latest expected works list, with notes from National Highways, shows that three closures are due to start over the next two weeks:
• A3, from 9pm January 27 to 6am January 28, slight delays (under 10 minutes): A3 both directions Hindhead Tunnel, Contraflow for tunnel maintenance.
• A3, from 8pm January 28 to 6am February 1, moderate delays (10-30 minutes): A3 both directions Longmoor to Hogs Back, carriageway closure for surveys.
National Highways is responsible for maintaining motorways and major A-roads, so closures of smaller roads will not be included in their schedule.